Mechanical Draughtsman (Punjab)
Cheema Boilers Limited – Date posted: 25 Jun 2015
1.) Preparing General Arrangement of Boiler drawings.
2.) Preparing P&ID & Expansion moment diagram.
3.) Preparing Pressure Parts drawings.
4.) Preparing Non-Pressure parts drawings.
5.) Preparing I.B.R. Piping (integral piping) routings layouts.
6.) Preparing Non-I.B.R. Piping routings layouts.
7.) Ducting layouts (P.A. ducting, F.D. ducting, S.A. ducting, I.D. ducting etc.)
8.) Steel Structure layouts & drawings.
9.) Checking layouts & in house drawings.
10.) Preparing material list (B.O.M.) of detail drawings.
11.) Preparing inputs for various departments of company & for venders….
0 comments:
Post a Comment